statable Statistics for study and research

Control chart (Shewhart, CUSUM, EWMA)

Has the process changed? A control chart plots group means in order, with a center line and limits, often ±3 standard errors. A point outside is a signal: probably more than chance is at work. Phase 1 estimates limits from past data, phase 2 then monitors continuously. CUSUM and EWMA combine several groups and detect small, lasting shifts sooner.

Example: Stable: about 3 in 1000 points outside. Several in short succession are a clear signal.

Caution: If a stable process stays inside the limits, the variation is chance: adjusting then increases the spread. Limits from few groups are imprecise.

Technical terms: Standard error (spread of the group means), stable (the distribution stays the same over time).

Open in Statable