OR, RR, HR
OR is the odds ratio, RR the relative risk (risk ratio), HR the hazard ratio. For all of them 1 means: no difference between the groups. Above 1 means higher in the group in the numerator (usually the first), below 1 lower.
Example: Risk 0.20 against 0.10: RR = 2.0, OR = 0.25 / 0.111 = 2.25.
Caution: OR and RR are similar only for rare events. An OR must not be read as an RR.